1. Development of the Orange-Senqu River Basin Integrated Water Resource Management and Investment Plan (IWRM&I, 2026-2035)
  2. DRILLING AND CONSTRUCTION OF MONITORING BOREHOLES ALONG THE MOHOKARE RIVER
  3. Construction of Three (3) Hydrometric Stations for Department of Water Affairs
  4. Press release- ORASECOM welcomes new head, Executive Secretary – Molosiwa
  5. Consulting Services to provide technical support and facilitate private sector engagement within the Orange-Senqu River Basin
  6. Executive Secretary: Orange Senqu River Commission
  7. TERMS OF REFERENCE For The Appointment of a Service Provider for The Review of The Estuarine Management Plan (EMP) For The Orange – Senqu River Mouth Estuary
  8. PROCUREMENT, SUPPLY AND DELIVERY OF EQUIPMENT FOR /AI- /AIS NATIONAL PARK AND DREIHUK PROSOPIS HARVESTING SITES, IN NAMIBIA
  9. Consultancy services to facilitate the marketing and sales of prosopis products for /ai-/ais, dreihuk, gibeon and mariental pilot sites
  10. Support to the Orange River Mouth rehabilitation project
  11. Namibia prepares for combating Prosopis
  12. ORASECOM is hiring consultants
  13. 4th SADC Groundwater Conference 10-12 November 2021
  14. Botswana Desalination Plant Project Launched
  15. 39th IAHR World Congress
  16. Water is a matter of life and death – Opinion piece
  17. Webinar: Transboundary Water Management under conditions of Climate and Political Uncertainty: Middle Eastern and South African Perspectives
  18. World Water Week Groundwater Webinar
  19. Interview with Lenka Thamae, Executive Secretary of ORASECOM on the Lesotho-Botswana Water Transfer scheme
  20. Webinar Series: Groundwater – Base Rock of Resilience
  21. Climate Resilient Water Resources Investment Strategy & Plan & Lesotho-Botswana Water Transfer (L-BWT) Project
  22. GIZ
  23. Joint Water Resources Quality Survey (JBS)
  24. FGEF Support
  25. Water Information System (WIS)
  26. Joint Irrigation Authority (JIA)
  27. Water Information System (WIS)
  28. Adequate Rainfall Predicted for SADC October-December Season
  29. Orange-Senqu Basin Wide Groundwater Survey
  30. Fundraising for the Lesotho-Botswana Water Transfer Project
  31. Orange-Senqu River Awareness Kit
  32. International Conference on FRESH WATER GOVERNANCE FOR SUSTAINABLE DEVELOPMENT, 5th – 7th November, 2012, Champagne Sports Resort, Central Drakensburg (KwaZulu-Natal), South Africa
  33. 4th Orange-Senqu River Basin Symposium, 6th – 7th June 2012, Campus of the University of the Free State, Bloemfontein, South Africa
  34. The African Transboundary River Basin Support Programme came to an end
  35. Towards Transboundary Evironmental Assessment Guidelines for the Orange-Senqu River Basin
  36. ORASECOM initiates work on the Orange-Senqu River Learning Box
  37. The ORASECOM Secretariat takes delivery of a three dimensional map of the basin
  38. ORASECOM publishes its “State of the Orange-Senqu River System” Report
  39. ORASECOM initiates work on the Orange-Senqu River Learning Box
  40. Training on Aquatic Ecosystem Health Monitoring
  41. The Urban Pollution Workshop at Mohale Dam
  42. Phase 2 of an IWRM Plan Development Project came to an end
  43. ORASECOM opens the Secretariat offices
  44. ORASECOM is visited by the Volta Basin Authority
  45. Training on Water Resources Yield Simulation Models
  46. ORASECOM at the 3rd Africa Water Week in Addis Ababa
  47. ORASECOM comes of age at 10!
  48. ORASECOM participates in the 13th International RiverSymposium
  49. ORASECOM works with the Benguela Current Commission
  50. Environmental Flows Requirements Site selection and survey for Caledon, Kraai, South Africa & Lesotho
  51. First Delphi Workshop, June 2010, North West, South Africa
  52. ORASECOM Prepares for the Joint Basin Survey – 1
  53. Workshop on Stakeholder Participation – Maseru, Lesotho
  54. Visit of the Nile Equatorial Subsidiary Action Plan group
  55. Visit to Lesotho Flow Gauging Stations

Background and objective of the consultancy
The objective of this consultancy is to support ORASECOM in the development of their 2nd IWRM&I Plan including conducting the stakeholder consultations and situation analysis, modelling, implementation plan and financing strategy.
The next 10-year Orange-Senqu River basin IWRM plan shall build upon the first ten-year

2015-2024 IWRM plan including on the results of the end-term evaluation and include an investment, as well as a climate change action plan (IWRM&I Plan). The implementation period of the IWRM&I Plan will run from 2026 to 2035.
The IWRM&I Plan will include an implementation plan that identifies activities that will be implemented collectively by all the state parties through ORASECOM and the existing bilateral/trilateral institutions and those that will be implemented separately by the state parties. It will distinguish between firstly, matters which have been sufficiently studied to allow actions to be performed routinely by ORASECOM and secondly those matters on which further study or research is needed before collective action will be practical.

The IWRM&I Plan should be forward looking (10 years in scope) and provide a framework that enables the basin to realise environmental, economic and social benefits associated with better transboundary water resources management, while taking considering needs for increased investments and climate change action in the basin. The objective of the 2015-2024 IWRM Plan was set as “to provide a framework for sustainable development and management of the water resources, taking into account the need for improved distribution and equitable allocation of benefits, in order to contribute towards socio-economic upliftment of communities within the basin, and ensure future water security for the basin States.” In addition, the IWRM&I Plan should strive to link the water sector with national environmental sustainability, economic growth and poverty alleviation strategies based on the fact that IWRM is not an end in itself but rather a means to achieve economic and social development.

The IWRM&I Plan shall also help position ORASECOM to access its own financing in the future, including from climate or blended finance sources and its transition toward basin-led implementation and long-term independence

In the development of the IWRM&I Plan, particularly the results of two parallel activities of the TWM V project shall be integrated and considered:
• Review of the ORASECOM 2015-2024 IWRM Plan and delivery of a proposed structure of the 2026-2035 IWRM&I Plan
• Development of Integrated Catchment Management and Development Plans (ICMDPs) in Lesotho

Find more information and documents here.

Terms of Reference: Development of the Orange-Senqu River Basin Integrated Water Resource Management and Investment Plan (IWRM&I, 2026-2035)